Probe Mines Ltd.

Borden Lake

Show printable version of 'Drill Results December 2010' in a New WindowEmail 'Drill Results December 2010' to a friend
 

Drill Results December 2010


The Company initiated additional drilling on the property in December of 2010, to determine the full width of the zone followed by further testing along strike and at depth. The discovery zone was expanded to 560m in length and included 182 metres of 1.1g/t Au.

Holes were drilled on 100 metre-spaced sections, with each section comprising two holes drilled at different angles to test the zone at vertical depths of approximately 150m and 200m, respectively. In each section the mineralized zone is described by higher grade zones contained within a broad low grade envelope. Significant widths of mineralization include 182 metres averaging 1.1 g/t Au, including 41 metres grading 3.3 g/t Au and 10.7 metres averaging 6.5 g/t Au in Hole 10, and 123 metres of 1 g/t Au, including 26 metres of 2.4 g/t Au in Hole 14, located 200 metres to the northwest of Hole 10. Numerous high-grade zones have also been identified, over appreciable widths, with individual samples returning up to 26.4 g/t Au.




DECEMBER 2010 SELECTED DRILLHOLE ASSAY INTERVALS

DDH Section From (m) To (m) Width (m) Au (g/t)
BL10-09 Discovery 19 195 176 0.5
including 53 131 78 0.9
also including 174 195 21 0.6
 
BL10-10 Discovery 19 201 182 1.1
including 39 151 112 1.7
including 71 112 41 3.3
including 85 95.7 10.7 6.5
 
BL10-11 100m NW 6 200 194 0.5
including 12 69.3 57.3 0.6
also including 85.9 95.2 9.3 1.2
also including 122.5 153 30.5 1.2
 
BL10-12 100m NW 4.8 207 202.2 0.4
including 4.8 142 137.2 0.6
including 99 142 43 1.3
 
BL10-13 200m NW 8 184.2 176.2 0.7
including 70.5 137 66.5 1.4
including 81.3 130 48.7 1.8
including 86 118 32 2.1
 
BL10-14 200m NW 4 191.8 187.8 0.7
including 4 127 123 1.0
including 60 127 67 1.5
including 76.7 102.6 25.9 2.4
including 86 102.6 16.6 2.8
 
BL10-15 300m NW 56 133.5 77.5 1.0
including 91.6 114.1 22.5 1.8